Note:  The Catawba Crossings Corridor is 1,000 feet-wide for the purposes of this study and is subject to change.  A proposed roadway alignment would be considerably narrower.  Alignment alternatives will not be evaluated as a part of this feasibility study.

The Catawba Crossings Project Corridor is based on alignments developed by two other NCDOT Feasibility Studies. The Catawba Crossings Feasibility Study (Project ID H190069; SP-1710A) was completed in 2017 by NCDOT and established a conceptual roadway alignment from NC 279 (S. New Hope Road) in Gaston County to I-485 in Mecklenburg County. This was completed as a quick engineering exercise to determine potential costs associated with such a project. It was not a formal study and the conceptual design are subject to change. This design concept is being further evaluated by the Catawba Crossings Feasibility Study.

The NCDOT began the Airport Area and River District Feasibility Study (Project ID H184060) in 2019, but it was put on hold last year and is not final. This incomplete study was reviewed by the Catawba Crossings Project Team and forms the basis for the conceptual roadway alignment on the Mecklenburg County side of the Catawba River only.

 

 

You are now leaving Catawba Crossings

Catawba Crossings provides links to web sites of other organizations in order to provide visitors with certain information. A link does not constitute an endorsement of content, viewpoint, policies, products or services of that web site. Once you link to another web site not maintained by Catawba Crossings, you are subject to the terms and conditions of that web site, including but not limited to its privacy policy.

You will be redirected to

Click the link above to continue or CANCEL

Translate »