The GCLMPO received 509 written comments during the public comment period (attached). Three hundred ninety-one (391) written comments were collected from the MetroQuest platform. MetroQuest survey respondents could enter written comments at multiple places throughout the survey. There was only one direct question and open comment field included in the survey for “other” transportation needs (152 comments discussed in Transportation Needs on pgs. 3-4).
The GCLMPO received 116 comments via email during the comment period. One written comment was received via the Project Facebook page and one via YouTube in association with the introductory video.
All written comments were recorded in a Microsoft Excel spreadsheet and reviewed. Keywords were identified within each comment and recorded. These keywords were then assigned to one of six comment themes that emerged. It was not uncommon that a single comment addressed two or more comment themes.
Six major comment themes were identified:
GCLMPO reviewed each comment. The responses that follow are intended to address the main topics of concern expressed by the public in general. Responses were crafted with the best available, current information.
Catawba Crossings provides links to web sites of other organizations in order to provide visitors with certain information. A link does not constitute an endorsement of content, viewpoint, policies, products or services of that web site. Once you link to another web site not maintained by Catawba Crossings, you are subject to the terms and conditions of that web site, including but not limited to its privacy policy.
Click the link above to continue or CANCEL